Timber Frame Rationale, and First Look at Our Version
One look at the MVC floor plan and even a casual observer could see that we're doing timber frame construction. (The posts are a dead giveaway.)
I didn't get exposed to timber framing until way too late in life, and now I wouldn't consider stick frame construction for anything, even a shed. Every day I bike by all these massive new stick frame additions and new stick frame construction here in Edina and after I say, "Gross!" — usually in reference to the already dated, cheesy-ass architecture — I next ask myself, "Why?"
Even putting aside timber framing's subjective superiority over stick frame, like its clean, simple, organic, timeless, rugged, and sturdy appearance, it's *objectively* more practical and better than stick frame in three important ways:
- They can be cut offsite. In a controlled environment, with precision, *before you even own a piece of property*, then shipped to the building site. I don't care if it's Larry Haun's Ghost doing the stick framing; he still can't do it offsite.
- They can be erected quickly. While the MVC is small — just 36x24 — the Big River Timberworks (BRT) crew will put up the frame *and fully enclose it in SIPs* in 5 days. Let's call the frame erection half of that; 2.5 days. Stick framing is measured in weeks.
- They don't have structural interior walls. I've laid out interior walls on the floor plan, but this is all still pretty flexible, for the most part, and they're all partition walls. Nothing is load-bearing. Nothing is critical. I can put an interior wall anywhere, and when I goof it up, I can put it somewhere else, no problem. Someone can correct me if I'm wrong, but unless you use trusses, stick frame will have an interior load-bearing wall.
Onto the specifics about our frame:
- Port Orford Cedar. All my previous — and very limited — experience is with EWP (Eastern White Pine), which is readily available, cheap, and easy to work with, but I hate how it yellows over time. Thanks to BRT, I got turned onto Port Orford Cedar, which grays over time. Please don't judge our carbon impact having timbers shipped from Coos Bay, Oregon, but we far prefer POC over EWP, and really all the other timber options we looked at.
- No braces. Timber frame purists might scoff at our frame, but a brace-free design really cleans things up, pretty dramatically. Again thanks to BRT for pointing us in this direction.
For a few days I thought I could cut this frame myself over time, in my garage, but after practicing this rather advanced joinery (for me) on some scraps, I gave up. 4 hours yielded this sad-looking post. At this pace we would have the MVC when I'm dead.